• Menu
  • Menu

Main Drift Opening

Full cars were hauled out through the main drift opening and unloaded at the headhouse, where the coal would be ferried down the hill. Cars with waste shale were switched to the slate tracks for dumping elsewhere. Cars needed repairing would be sent to the car repair shop.

Leave a Comment